国产精品原创巨作AV_国产精品一区二区三区A∨_亚洲国产天堂网_99精品视频在线无码A片

您好,歡迎進(jìn)入勝利油田利豐稠油技術(shù)開發(fā)有限公司官網(wǎng)!
Products
你的位置:HomePage > Products

Horizontal well non drilling plug cementing completion tool

    詳細(xì)說明

    Product Introduction:

    Mainly used to provide a cementing circulation channel during the cement injection process at the top of the screen tube.

    Performance characteristics:

    Not changing the existing cementing process in the oilfield, compatible with conventional cementing processes

    Structural design can be adopted to ensure standardized inner diameter of the casing, which is convenient for later operation and construction

    Avoiding damage to the cement sheath caused by drilling plug construction is beneficial for ensuring cementing quality

    Avoiding damage to the pipe string caused by drilling plug construction and possible loosening and detachment phenomena

    Reduced completion drilling and plugging procedures, shortened well construction cycle

    Drillable structure design allows for continued drilling plug construction after salvage failure, ensuring safety and reliability

    Technical Parameter:

    Total length,mm

    6800

    Maximum outer diameter,mm

    215

    Liquid inlet pressure of rubber cylinder,MPa

    7

    Circulation channel opening pressure,MPa

    16-18

    Closing pressure of circulation channel,MPa

    20

    Salvage power,kN

    200