詳細(xì)說(shuō)明
After the completion of multi-layer fracturing construction, it is necessary to remove the entire well string and backwash the well, which can achieve a single circuit from the wellhead to the bottom of the well, achieve the purpose of cleaning the entire well, thoroughly sand flushing, and ensure the smooth removal of the string.
5-1/2Parameters and layering level of the sliding sleeve sandblasting device inside the casing
5 1/2套管內(nèi)水平井分級(jí)規(guī)格 | ||||||||||
series | first stage | second stage | third stage | fourth stage | fifth degree | Level 6 | Seventh level | Level 8 | Level 9 | Level 10 |
Tool model | PSQ95-24 | PSQ100 H1 | PSQ100 H1 | PSQ100 H1 | PSQ110 H2 | PSQ110 H2 | PSQ110 H2 | PSQ110 H2 | PSQ110 H2 | PSQ110 H2 |
Ball socket outer diametermm | - | 47 | 47 | 47 | 47 | 56 | 56 | 56 | 60 | 60 |
Ball socket inner diametermm | - | 26 | 29 | 32 | 35 | 38 | 41 | 44 | 47 | 50 |
Spherical diametermm | - | 28.8 | 31.8 | 34.8 | 37.8 | 40.8 | 43.8 | 46.8 | 49.8 | 52.8 |