国产精品原创巨作AV_国产精品一区二区三区A∨_亚洲国产天堂网_99精品视频在线无码A片

您好,歡迎進(jìn)入勝利油田利豐稠油技術(shù)開發(fā)有限公司官網(wǎng)!
Products
你的位置:HomePage > Products

Fracturing slide sleeve

    詳細(xì)說明

    Process principle:



    As the first stage fracturing slide sleeve, the toe end slide sleeve is inserted into the well along

     with the casing to the predetermined position and completes the cementing operation. During

     fracturing, only pressure is needed through the wellhead to open the slide sleeve, forming the 

    first stage of fracturing channel, which can replace continuous tubing perforation operation, 

    improve operation efficiency, reduce work risks and costs.



    Technical advantages:



    Large diameter design ensures the passage of cementing plugs and later operation tools;



    Can meet the requirements of full well pressure testing before shale gas well fracturing, with 

    adjustable pressure testing for 15-30 minutes and reliable sliding sleeve opening;



    Spray anti adhesive coating on the inner wall of the sliding sleeve to prevent the cementing 

    cement slurry from solidifying on the inner wall.


    previous item: Tubing anchor next item: Intubation bridge plug