詳細(xì)說(shuō)明
Product Introduction:
According to the normal bridge plug construction process, after the construction operation,
the well closure time is determined based on the underground temperature and fluid, and
the soluble bridge plug is dissolved for 5-10 days. After opening the well, the fluid in the
lower section can pass through the bridge plug channel for normal blowout or production.
During the blowout and production process, the soluble bridge plug can continue to dissolve
in the wellbore fluid until it naturally disappears.
Technical parameters:
Serial Number | model | inside diameter | outside diameter | Temperature | pressurization | Setting sleeve | Lose one's grip |
1 | 4.5寸 | 30 | 95 | 150℃ | 70MPa | 105mm-110mm | 10-12t |
2 | 4.5寸 | 30 | 90 | 150℃ | 70MPa | 99.56mm-103.88mm | 10-12t |
4 | 5寸 | 30 | 100 | 150℃ | 70MPa | 108.62mm-114.14mm | 16-18t |
5 | 5寸 | 35 | 105 | 150℃ | 70MPa | 114.14mm-118.62mm | 16-18t |
6 | 5.5寸 | 35 | 110 | 150℃ | 70MPa | 118.62mm-124.26mm | 16-18t |
7 | 5.5寸 | 55 | 112 | 150℃ | 70MPa | 124.26mm-127.26mm | 16-18t |